MYHOSPITALNOW.COM

Find Trusted Doctors & Hospitals

Discover healthcare providers, compare hospitals, and explore treatment options worldwide.

Free Treatment Quotes • Doctor Search • Hospital Comparison

Find Healthcare Options

www.myhospitalnow.com

More Important Build Definitions

I need to define some common build terms that are used throughout this article. It is also important for groups or teams to define these terms on a project-wide basis so that everyone is clear on what he is getting when a build is released.

  • Pre-build— Steps taken or tools run on code before the build is run to ensure zero build errors. Also involved are necessary steps to prepare the build and release machines for the daily build, such as checking for appropriate disk space.
  • Post-build— Includes scripts that are run to ensure that the proper build verification tests (BVTs) are run. This also includes security tests to make sure the correct code was built and nothing was fused into the build.
  • Clean build— Deleting all obj files, resource files, precompiled headers, generated import libraries, or other byproducts of the build process. I like to call this cleaning up the “build turds.” This is the first part of a clean build definition. Most of the time, build tools such as NMake.exe or DevEnv.exe handle this procedure automatically, but sometimes you have to specify the file extensions that need to be cleaned up. The second part of a clean build definition is rebuilding every component and every piece of code in a project. Basically the perfect clean build would be building on a build machine with the operating system and all build tools freshly installed.
  • Incremental build— The secret to getting out a daily build to the test team, regardless of circumstances, is to perform incremental builds instead of daily clean builds. This is also the best way that you can maintain quality and a known state of a build. An incremental build includes only the code of the source tree that has changed since the previous build. As you can guess, the build time needed for an incremental build is just a fraction of what a clean build takes.
  • Continuous integration build— This term is borrowed from the extreme programming (XP) practice. It means that software is built and tested several times per day as opposed to the more traditional daily builds. A typical setup is to perform a build every time a code check-in occurs.
  • Build break— In the simplest definition, a build break is when a compiler, linker, or other software development tool (such as a help file generator) outputs an error caused by the source code it was run against.
  • Build defect— This type of problem does not generate an error during the build process; however, something is checked into the source tree that breaks another component when the application is run. A build break is sometimes referred to or subclassed as a build defect.
  • Last known good (LKG) or internal developers workstation (IDW) builds— These terms are used as markers to indicate that the build has reached a certain quality assurance criterion and that it contains new high-priority fixes that are critical to the next baseline of the shipping code. The term LKG originated in the Visual Studio team, and IDW came from the Windows NT organization. LKG seems to be the more popular term at Microsoft.

Find Trusted Cardiac Hospitals

Compare heart hospitals by city and services — all in one place.

Explore Hospitals
MotoShare.in delivers cost-effective bike rental solutions, empowering users to save on transportation while enjoying reliable two-wheelers. Ideal for city commutes, sightseeing, or adventure rides.

Related Posts

Team Foundation Build 2010: Architecture, Build Definitions, and Migration from TFS 2008

Team Foundation Build 2010 introduced a controller/agent build architecture, richer build definitions, and gated check-in workflows for TFS teams. This revised guide turns the original topic list into a practical reference for setup, customization, and migration planning.

Read More

Build and Release Engineer Training: Objectives, Curriculum, Tools, and Enrollment Details

A structured overview of the original Build and Release Engineer training post, including target audience, learning objectives, tool coverage, schedule, fees, and enrollment links. This revised version keeps the original details while organizing them into a practical reference format.

Read More

Build and Release Management in the SDLC: SCM Concepts, Workflow, and Practical Examples

This guide explains how build and release management fits into the software development lifecycle and how SCM keeps delivery reproducible. It covers core concepts, a practical workflow, and example Git and CI pipeline patterns.

Read More

IBM Rational Build Forge Training Guide: Curriculum, Workflow, and Hands-On Labs

This revised guide turns a brief course outline into a practical IBM Rational Build Forge training reference. It covers the core objects, execution workflow, admin topics, and realistic lab commands teams can use in corporate training.

Read More

.NET Build and Release Training: Curriculum, Toolchain, Workflow, and Enrollment

A structured, engineer-friendly rewrite of the original .NET Build and Release course page. Review objectives, tool coverage, CI/CD workflow, prerequisites, fees, and key links in one place.

Read More

NAnt Training Guide for Build and Release Engineers: Syllabus, Labs, and Workflow

A revised NAnt training page focused on practical skills for SCM, build, and release engineers. It includes the original syllabus topics, delivery options, a CI workflow diagram, and hands-on NAnt examples.

Read More
Subscribe
Notify of
guest
0 Comments
Newest
Oldest Most Voted
0
Would love your thoughts, please comment.x
()
x